Right-of-way (ROW) Construction - Transportation (2024)

Permitting for Stay Healthy Streets

We've recently published a fact sheet outlining the additional conditions related to construction use and utility permitting on Stay Healthy Streets.

I want to learn more about...


Step 1: Confirm that this is the right permit for your work

Step 2:Prepare the documents required for your submittal

Step 3: Determine if other documents may be required

Step 4: Apply for your permit!

Step 5:Check the status on your permit in review

Step 6: Responding to Corrections in review

Step 7: Pay for your permit

Step 8: Notification, Job Start, and Temporary No-Park Permit Requirements

Step 9: Apply for an Amendment to modify/extend your permit

Step 1: Confirm that this is the right permit for your work

This permit type is for staging materials and/or equipment for construction related purposes, such as:

  • construction-related deliveries
  • temporary material and/or vehicle staging
  • public safety buffers from construction
  • scaffolding and/or temporary structures

If you are unsure if you qualify for this permit type, call (206) 684-5253 or e-mail us at sdotpermits@seattle.gov.

back

Step 2:Prepare the documents required for your submittal

The following documents will be required to submit the Application:

ROW Construction Permits (SUCONST)
Document TypeDocument Description
Right-of-Way Impact Plan (ROWIP)Right-of-way closures with details perCAM 2116
Site PlanFor some uses such as scaffolding and transit facility. Location details perCAM 2116
Letter of AuthorizationRequired if the Applicant or FRP contact is different from the Owner contact

ROWIP and Site Plan templates can be found here.

back

Step 3: Determine if other documents may be required

Documents not required to submit the ROW Construction permit application may be required later in the permit process. Below is a list of documents that may be required based on the project scope, location and permit type.

ROW Construction permits follow the below permit steps. Document requirements are set to one of the below referenced permit steps.

Right-of-way (ROW) Construction - Transportation (1)

Document TypeDocument DescritpionPermit Step When the Document is Required
Technical PlanDetail drawing or calculations based on the use perCAM 2116Screening
Traffic Control Plan (TCP)Temporary Traffic Control Plan perCAM 2111and the City of Seattle Traffic Control Manual for In-Street WorkEither atApplicationif the street category is manually set to Arterial or atScreeningwhen the reviewer verifies work is on an arterial orany street in a Hub and pedestrian, bicycle and/or vehicle mobility is impacted
Temporary No Parking Confirmation
(Paid Parking Permit)
If paid parking is impacted by the project, some sort of proof that a parking permit has been submittedReview Evaluation
Other DocumentsBased on project location and impact;Historic District CoA, Holiday Moratorium Waiver perCAM 2107, Pavement Moratorium, etc.Review Evaluation
Corrections ResponseStreet Use comments Sheet with ResponsesScreening- cannot submit Corrections Submitted if this is required


If an application is submitted in error, you can withdraw the application by clicking on the Make Changes button on the record and selecting ROW Withdrawal and clicking the Continue Application button. How to instructions on how to withdraw an application can be found here.

You are not able to make any changes to the application once it is submitted. If application and/or document changes need to be made during the review process, email those change requests to the assigned reviewer or SDOTPermits@seattle.gov if the record is unassigned.  

back

Step 4: Apply for your permit!

ROW Constructionapplications must be submitted through theSeattle Services Portal. One you are logged in, you can apply for your utility permit by following the how to instructionshere.

back

Step 5:Check the status on your permit in review

Current timelines can be found on ourStreet Use Permitting Timelines and Updates website.You can find more information on the following topics in the Understanding the Street Use Permit Process, Record Status, Target Dates, and Permit Timelines help article.

  1. What are the Street Use permit process steps?
  2. What happens at each permit step and how does it get assigned?
  3. How do I check and understand the status of the SDOT Street Use record?
  4. What does Targeted For date mean and how is it determined?
  5. How long does the overall permit process take?

back

Step 6: Responding to Corrections in review  

When a revised and/or additional document is required before we can proceed with or complete the review process, an automatic email notification will be sent noting the record status has been changed to 'Awaiting Corrections.' 

Required documents will show as a condition of the permit. For details on each condition, click on the View Condition button on the record.   

If a Corrections Response condition is required, you will need to upload the Street Use Comments Sheet with your responses added.  

To download the Street Use Comments Sheet and marked-up documents (if applicable), go to the Attachments tab of your record and click on the blue hyperlink of each document you want to download.  Once revised and/or additional documents are ready to submit, click on the Upload button in the Attachments tab. How to instructions on how to respond to corrections can be found here.     

back

Step 7: Pay for your permit

How to instructions on how to find and pay your permit fees can be foundhere. If you are unsure how fees are calculated, visit ourHow to Estimate and Pay Permit Fees websitefor more information.

If you need to change use information (e.g., dates, square footage etc.), email the assigned reviewer orSDOTPermits@seattle.govif unassigned.

Once the permit has been paid and issued, youcan print your permit and all approved documents found in theAttachmentstab of the record.  How to instructions on how to find the permit and attached documents on the record can be foundhere.

back

Step 8: Notification, Job Start, and Temporary No-Park Permit Requirements

Prior to starting your project, you will need to provide the following notification:

  1. Public notification in advance of starting your project perCAM 2117
  1. Job start notification to let the Street Use inspector when you will begin your project per the how to instructions foundhere. After the initial inspection is passed, additional inspections may need to be scheduled. For more information on inspection types and how to schedule them, visit ourInspections website.
  1. Non-paid or paid parking notification and permits per ourTemporary No Parking Permits website.

back

Step 9: Apply for an Amendment to modify/extend your permit

Once your permit has been issued, application, scope of work and/or date changes need to be made by submitting an amendment application through the Seattle Services Portal.

Amendments have different (shorter) process steps than an initial application. Documents are not required for an Amendment but can be optionally uploaded.

When an Amendment is issued, it updates information on its Parent (initial) permit record.

The below amendment types will be available once your permit has been issued:

Date Change Amendment -used to request a change to the start date of a use on an issued permitbefore the start of the use.

  • Uses cannot be added or extended and the duration cannot be changed
  • Scope of work and/or application changes cannot be requested
  • In Hub areas, you will need to coordinate dates outside the initial issued dates and extension periods before proceeding with work (email SDOTConstructionHub@seattle.gov)
  • How to instructions on how to apply for a Date Change Amendment can be foundhere.

Extension Amendment -used to request the extension of an existing use(s) on an issued permit

  • Uses cannot be added
  • Scope of work and/or application changes cannot be requested
  • In Hub areas, you will need to coordinate dates outside the initial issued dates and extension periods before proceeding with work (email SDOTConstructionHub@seattle.gov)
  • How to instructions on how to apply for an Extension Amendment can be foundhere.

Revision Amendment -used to request application information changes (contact, address and/or related information), scope of work changes (change of work zone, add or remove uses) and/or extending an existing use(s)

  • Application and scope of work changes can be requested in the Amendment Description
  • Uses can be added and extended
  • Scope of work changes will require revised documents to be uploaded (e.g. ROWIP, Site Plan, TCP, Project Schedule etc.) and a full review will need to be performed
  • How to instructions on how to apply for a Revision Amendment can be foundhere.

back

Right-of-way (ROW) Construction - Transportation (2024)
Top Articles
Latest Posts
Article information

Author: Stevie Stamm

Last Updated:

Views: 6299

Rating: 5 / 5 (80 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Stevie Stamm

Birthday: 1996-06-22

Address: Apt. 419 4200 Sipes Estate, East Delmerview, WY 05617

Phone: +342332224300

Job: Future Advertising Analyst

Hobby: Leather crafting, Puzzles, Leather crafting, scrapbook, Urban exploration, Cabaret, Skateboarding

Introduction: My name is Stevie Stamm, I am a colorful, sparkling, splendid, vast, open, hilarious, tender person who loves writing and wants to share my knowledge and understanding with you.